0333 207 0475 info@kcultd.co.uk

Pressure Testing & Chlorination in Newcastle

Tested. Disinfected. Approved.
Ready for connection.

Fully Compliant Pressure Testing & Chlorination

Before a new water main or service is brought into use, it must be tested and disinfected to meet strict water industry standards.

At Kurek, we handle the full process, ensuring your system is watertight, fully disinfected and approved for connection first time. Providing pressure testing and chlorination services throughout Newcastle and the surrounding areas, we ensure every project meets the latest water industry standards.

One contractor. One process. Fully signed off.

Kurek Utilities are experienced in water infrastructure and commissioning, delivering fully compliant pressure testing and chlorination works in line with current industry standards.

We provide a complete, end-to-end service from pressure testing and chlorination through to final certification, ensuring your system is ready for connection first time.

Below is our structured, compliant commissioning process..

1. Swabbing

Cleaning the pipe removes debris and air, ensuring effective disinfection and reducing the risk of failed samples.

2. Pressure Testing

We pressure test the system to confirm it is fully sealed and meets required standards before disinfection.     

 

3. Chlorination

A controlled chlorine solution is introduced through the system to eliminate bacteria and ensure hygienic pipework.

 

4. Flushing

Controlled flushing removes chlorinated water and returns the system to normal operating levels, ready for sampling.

5. Sampling

We take compliant water samples and manage testing through UKAS-accredited laboratories. 

 

Sampling & Laboratory Testing

We take compliant water samples and coordinate testing through UKAS-accredited laboratories, ensuring all results meet water authority requirements.

Samples are taken correctly, stored safely and tracked through to completion, giving you confidence that your system will pass first time, avoiding delays and rework.

Certification & Approval

Once testing is complete, we provide full certification and documentation required for water authority approval.

All results, readings and evidence are clearly presented, ensuring a smooth sign-off process and allowing your connection to proceed without issue.

We reduce the risk of failed connections by managing the entire commissioning process correctly from start to finish.

If you’re planning a new water connection contact Kurek today to arrange professional pressure testing and chlorination, ensuring your project is fully compliant and ready for approval.

You may also be interested in:

Impact moling

Leak detection & repair

Water supply installation & replacement 

Repairs & maintenance

Civil & enabling works

Call Us Today